China to East Africa and the Indian Ocean: how long does a container take?

The transit time a carrier advertises covers only part of the real lead time. Typical ranges by corridor, and what comes before and after the voyage.

The SELA International team

The question addressed

How long does sea freight take from China to East Africa and the Indian Ocean?

Key takeaway

From Shanghai, Ningbo or the ports of southern China, port-to-port transit runs, as an indication, at roughly 20 to 30 days to Mombasa, 22 to 35 days to Durban, 25 to 35 days to Dar es Salaam and 18 to 25 days to Port Louis on a direct service; Toamasina, usually reached after transshipment, takes more like 30 to 45 days. Each transshipment adds the wait for the connecting vessel and a second leg. The end-to-end lead time, from order to customs release, is considerably longer: production, the cut-off, port congestion and customs clearance all come on top.

The question comes up in almost every enquiry, and the answer depends on three things: the port of loading, whether a direct service exists to the destination port, and what is meant by “lead time”. The figures below are indicative ranges, compiled in 2026 from transit times published by logistics operators and rotations announced by carriers; the “with transhipment” column adds a weekly connection and a second leg. They vary from one rotation to the next and from month to month, and they are no substitute for the schedule of the vessel actually booked.

Direct service or transshipment

In carrier terminology, a “direct” service means the container stays on the same vessel all the way to the destination port. It does not mean non-stop. One China–Kenya rotation announced in 2023 called at Qingdao, Shanghai, Ningbo, Nansha, Singapore and Port Klang before Mombasa, with an advertised transit of 24 days from Shanghai and 20 days from Nansha. Southern Chinese ports, loaded late in the Asian rotation, often gain a few days over northern ones.

Under transshipment, the container is discharged at a hub port and reloaded onto a second vessel: Singapore, Port Klang, Tanjung Pelepas, Colombo, the Arabian Sea ports, or Port Louis, which the Mauritian port authority presents as a hub-and-spoke platform for East Africa and the other Indian Ocean islands. The risk lies in the connection: a container that misses its feeder waits for the next one, often a week later when the service is weekly.

Indicative ranges by corridor

Port-to-port transit from Shanghai, Ningbo, Shenzhen or Nansha — indicative ranges (2026)
DestinationDirect serviceWith transshipmentNotes
Mombasa (Kenya)20 to 30 days30 to 45 daysWeekly sailings from the main Chinese ports
Dar es Salaam (Tanzania)25 to 35 days35 to 50 daysAnchorage waits possible before berthing
Durban (South Africa)22 to 35 days30 to 45 daysWeekly sailings; some services transship en route
Port Louis (Mauritius)18 to 25 days25 to 35 daysTransshipment hub for the region
Toamasina (Madagascar)Infrequent30 to 45 daysFrequently transshipped at Port Louis or an Asian hub

These ranges are deliberately wide. For the same destination port, the gap between the fastest and slowest rotation commonly exceeds a week, depending on the order of calls, the number of Asian ports served and the vessel’s commercial speed. Links to Port Louis and Toamasina, less frequent than those to Mombasa or Durban, are also the most exposed to rotation changes.

Reading a sailing schedule

A sailing schedule shows, for each departure, the vessel name, the voyage number, the estimated time of departure (ETD), the estimated time of arrival (ETA) and the transit time between them. Three precautions apply. First, these are estimates, revised as the voyage progresses: the ETA shown at booking is not necessarily the one shown on sailing day. Second, the schedule sometimes names the transshipment port without the associated waiting time, which is only known once the connection is confirmed. Third, once the container is loaded, its number lets you follow it call by call on the carrier’s website and anticipate a delay before it knocks on to customs clearance.

From port-to-port transit to end-to-end lead time

The published transit starts when the vessel sails and ends when it arrives. For the buyer, the lead time that matters runs from order confirmation to the release of cleared goods. In between comes a sequence of steps, none of which appears on a sailing schedule.

  1. Production and packing, specific to each product and factory; this is often the longest and most variable item.
  2. Booking and cut-off: the container and documentary instructions must be handed in before a deadline set by the carrier, often one or more days before sailing. A missed cut-off means waiting for the next departure.
  3. The transit itself, intermediate calls included.
  4. The wait at the transshipment port, when the connection is not immediate.
  5. Anchorage time and congestion at the destination port, before the vessel even berths.
  6. Customs clearance, which depends first on a complete document set and on any inspections.
  7. Inland haulage, from factory to port of loading and from port of discharge to warehouse.

What drives variation in 2026

The route between China and East Africa does not pass through the Red Sea, but it feels the effects of broader disruption in ocean shipping. In its Review of Maritime Transport 2025, UNCTAD notes that geopolitical tensions have led to more rerouting, skipped port calls and longer voyages, with record ton-mile growth of nearly 6% in 2024, and that ports under strain face congestion and longer waiting times. It also stresses that persistently high transport costs weigh hardest on developing countries, particularly small island developing States and least developed countries.

  • Rotation changes: a carrier may add, drop or reverse calls from one season to the next, changing the transit to a given port.
  • Port congestion, at origin as well as destination, which can add several days at anchor.
  • Chinese seasonality: factory closures around Lunar New Year and the loading peaks that precede them tighten space.
  • Transshipment connections, all the more fragile when the feeder service is infrequent.

Making a supply schedule reliable

The schedule is built backwards from the date on which the goods must be available at destination. Three habits limit unpleasant surprises: ask for the port of loading, the rotation and, where relevant, the transshipment port before comparing two offers; keep the direct option for urgent shipments, even when it costs more; and send the complete document set before the vessel arrives. The Incoterms® 2020 rule chosen determines who books the freight: the buyer under FCA or FOB, the seller under CFR, CIF, DAP or DPU.

SELA INTERNATIONAL LTD states the Incoterms rule, the named place and the edition in every offer. Where freight is for its account, the transit time quoted is an indicative figure based on the rotations available at the time of the offer, not a commitment to an arrival date.

Sources

  1. UNCTAD — Review of Maritime Transport 2025: Staying the course in turbulent waters
  2. UNCTAD — Stormy seas for global shipping: UNCTAD warns of uncertainty, volatility and rising costs
  3. DP World — Shipping from China to Kenya
  4. DP World — Shipping from China to South Africa
  5. American Journal of Transportation — CMA CGM to enhance its ASEA KENYA service connecting Far East & Kenya
  6. Mauritius Ports Authority / UNCTAD — Building sustainable smart ports as a resilience-building strategy: challenges and opportunities, Mauritius experience (UNCTAD Multi-year Expert Meeting, 9th session, July 2022)

An operation to set up?

Describe your requirement and we will come back to you within 48 working hours.

Read next